NivaarExam Prep

24-Pet-A5 Petroleum Production Operations

Worked solutions to 6 past sittings (2014–2019), 30 questions. Pick a sitting, or start from a topic below.

Topics across the sittings

Topics that come up in more than one sitting, taken from the headings of our worked solutions. A topic counts once per sitting.

Questions by sitting

December 2019

  1. Question 1: Vogel and Fetkovich IPR — Single-Point and Four-Point Tests
  2. Question 2: Standing's Flow-Efficiency Method — Two-Point Test and Post-Frac Skin
  3. Question 3: Continuous Gas-Lift Design — Point of Injection and Injection Gas Rate
  4. Question 4: Electrical Submersible Pump — Required Horsepower
  5. Question 5: Standing's Method — Future IPR for a Weak Water-Drive Reservoir

December 2018

  1. Question 1: Rod-Pump Sizing — Straight-Line IPR
  2. Question 2: Vogel IPR and Standing's Flow-Efficiency Method — Hydraulic-Fracturing Evaluation
  3. Question 3: Nodal Analysis — Natural Flow Check and Gas-Lift Design
  4. Question 4: Gravel-Pack Completion — Producing Capacity
  5. Question 5: Electrical Submersible Pump — Required Horsepower

May 2018

  1. Question 1: Fetkovich IPR — Isochronal Test and Two-Rate Sensitivity
  2. Question 2: Standing's Flow-Efficiency Method — Hydraulic-Fracturing Evaluation
  3. Question 3: Nodal Analysis — Vogel IPR vs. Tubing Intake, Natural Flow and Gas-Lift Requirement
  4. Question 4: Gas-Lift Valve Mechanics — Force Balance for Valve No. 3
  5. Question 5: Two-Slurry Cementing Job — Slurry Volumes and Sack Counts

December 2017

  1. Question 1: Rod-Pump Sizing — Straight-Line IPR
  2. Question 2: Vogel IPR and Standing's Flow-Efficiency Method — Hydraulic-Fracturing Evaluation
  3. Question 3: Nodal Analysis — Natural Flow Check and Gas-Lift Design
  4. Question 4: Gravel-Pack Completion — Producing Capacity
  5. Question 5: Electrical Submersible Pump — Required Horsepower

December 2014

  1. Question 1: Inflow Performance — Vogel and Fetkovich Methods
  2. Question 2: Flow Efficiency, AOF, and Hydraulic Fracturing Response
  3. Question 3: Continuous Gas Lift Design
  4. Question 4: Electrical Submersible Pump (ESP) Sizing
  5. Question 5: Standing's Method — Predicting Future IPR

Undated paper

  1. Question 1: Rod-Pump Sizing — Straight-Line IPR
  2. Question 2: Vogel IPR and Standing's Flow-Efficiency Method — Hydraulic-Fracturing Evaluation
  3. Question 3: Nodal Analysis and Choke Sizing — Vogel IPR to a Fixed Wellhead Pressure
  4. Question 4: Nodal Analysis — Natural Flow Check and Gas-Lift Design
  5. Question 5: Electrical Submersible Pump — Required Horsepower