24-MMP-A2 Underground Mining Methods and Design

Worked solutions to 8 past sittings (2013–2019), 51 questions. Pick a sitting, or start from a topic below.

Topics across the sittings

Topics that come up in more than one sitting, taken from the headings of our worked solutions. A topic counts once per sitting.

Questions by sitting

December 2019

  1. Question 1: Haulage, Hoists, Ground Support, Ventilation Measurement and Cost Estimation
  2. Question 2: Capital and Operating Cost Estimation
  3. Question 3: Design of Ventilation Facilities
  4. Question 4: Room-and-Pillar and Vertical Crater Retreat (VCR) Mining
  5. Question 5: Hoist Duty Cycle, Motor Power and Production
  6. Question 6: Skip/Shaft vs. Truck/Incline Material Handling

December 2017

  1. Question 1: General Underground Mining
  2. Question 2: Hoisting and Winding
  3. Question 3: Mine Ventilation
  4. Question 4: Backfill
  5. Question 5: Innovative Shaft Sinking — Deepening while Hoisting
  6. Question 6: Shrinkage Stoping and Comparison with Other Mining Methods

December 2016

  1. Question 1: Backfill, Hoisting, Ventilation, Costs, Room-and-Pillar and VCR Mining
  2. Question 2: Mine Hoisting — Shaft Hoist Design
  3. Question 3: Mine Ventilation — Cooling/Dehumidification, Psychrometrics and a Cooling-Coil Process
  4. Question 4: Mine Cost Estimation — Camm (1989) Parametric Shaft and Block-Caving Models, Escalated to 2008
  5. Question 5: Cut & Fill and Longhole Mining Methods — Comparison
  6. Question 6: Shrinkage and Sub-Level Caving Mining Methods — Comparison

December 2015

  1. Question 1: Dilution & Recovery, Power & Services, Equipment Costs, Scheduling, Block Caving and Rock Haulage
  2. Question 2: Mine Ventilation — Kirchhoff's Laws, Fan Heating, Parallel Airways and the Mine Characteristic Curve
  3. Question 3: Dumping Skips, Overwinding, Locked Coil Rope, Motor Pole Pairs and Shaft Hoist Design
  4. Question 4: Cut-and-Fill Stoping — Overhand/Underhand, Fill Products, Captive vs. Ramp Access, and Ramp-in-Vein Resuing
  5. Question 5: Longhole Stoping — Development/Production Cycle and Avoca/Alimak/VCR Modifications
  6. Question 6: Vertical Crater Retreat (VCR) — Development, Blasting Cycle, Tailings Fill and Ore Loading

May 2015

  1. Question 1: Ground Support, Mining-Method Selection, Ventilation Measurement, Hoisting, Cost Indices and Haulage
  2. Question 2: Room-and-Pillar Development/Production Cycle, Continuous Mining, Stope-and-Pillar and Trackless-Equipment Case Study
  3. Question 3: Vertical Crater Retreat (VCR) — Development Cycle, Crater Blasting, Ore Loading and Backfill
  4. Question 4: Kirchhoff's Laws, Atkinson's Equation and Four Parallel Mine Airways
  5. Question 5: Camm (1989) Parametric Shaft and Block-Caving Cost Models, Escalated to 2008
  6. Question 6: Shaft Hoist Design — Rope, Drum, Cycle Time and Motor Power

December 2014

  1. Question 1: Support Systems, Mining-Method Geotechnics, Hoisting, Ventilation, Haulage and Cost Indices
  2. Question 2: Room and Pillar Development and Production Cycle
  3. Question 3: Vertical Crater Retreat — Development, Backfill and Ore Handling
  4. Question 4: Friction Hoist Duty Cycle, Motor Power, Production and Energy
  5. Question 5: Mine Ventilation Network Theory and a Four-Airway Parallel Circuit
  6. Question 6: Skip/Shaft vs. Truck/Decline Material Handling
  7. Question 7: Parametric Underground Mine Capital-Cost Estimating (O'Hara Method)

May 2014

  1. Question 1: Ventilation, Mine Planning, Cost Indices, Hoisting and Backfill Fundamentals
  2. Question 2: Ore Handling System and Mine Services Design for a Shaft-Accessed Vein
  3. Question 3: Longitudinal (Avoca) Retreat Mining of Narrow, Steeply Dipping Veins
  4. Question 4: Parametric Shaft and Block-Caving Cost Estimation with Escalation to 2012
  5. Question 5: Headframe Design Parameters, Hoist-Rope Engineering and Shaft Hoisting-System Selection
  6. Question 6: Shaft Hoist Design — Rope, Drum, Cycle Time and Motor Power
  7. Question 7: Cut-and-Fill Stoping Variants and Backfill Practice

May 2013

  1. Question 1: Feasibility Costing, Ventilation, Hoisting, Mining-Method Selection and Backfill
  2. Question 2: Mine Ventilation Characteristic Curve
  3. Question 3: Hoist Ropes, Overwind, Shaft Mucking and Skip Design
  4. Question 4: Cut-and-Fill versus Longhole Mining — Comparison
  5. Question 5: Shrinkage versus Sub-Level Caving — Comparison
  6. Question 6: Underground Mine Services
  7. Question 7: Backfill Preparation and Placement