Worked solutions to 13 past sittings (2013–2019), 86 questions. Pick a sitting, or start from a topic below.

Topics across the sittings

Topics that come up in more than one sitting, taken from the headings of our worked solutions. A topic counts once per sitting.

Questions by sitting

December 2019

  1. Question 1: Parts-Count Reliability and Mission Reliability
  2. Question 2: Process Aim and Capability, and Error of Measurement
  3. Question 3: Categories of Forecasting Techniques and a Two-Year Demand Series
  4. Question 4: Present Value of Ownership, and the Rate of Return on a Copier
  5. Question 5: Cycle Time and Production Rate of a Robot Cell
  6. Question 6: Break-Even Analysis and the Profit Effect of a Cost Trade
  7. Question 7: Priority Dispatching at a Single Work Centre

December 2018

  1. Question 1: A Control Criterion for the Watch-Gear Dimension
  2. Question 2: Break-Even Chart for the StaMCo Air Force Item
  3. Question 3: Mean Time Between Failures and Mission Reliability
  4. Question 4: Safety Margin on Strength, and Specification Limits from a Pilot Run
  5. Question 5: Production Planning and Control — Volume, Order Types and Dispatching
  6. Question 6: Numerical Control of Machine Tools
  7. Question 7: Robot Control Resolution and Memory Capacity

May 2018

  1. Question 1: Aggregate Production Planning and Preventive Maintenance
  2. Question 2: Load-Distance Analysis of a Four-Department Layout
  3. Question 3: Inventory Control System for a New Product
  4. Question 4: Control Charts for the Mean and the Range
  5. Question 5: Materials Handling, Inventory Control and Forecasting

December 2017

  1. Question 1: Planning strategies, preventive maintenance and forecasting categories
  2. Question 2: Two-dimensional geometric transformations
  3. Question 3: Lot sizing against a requirements schedule
  4. Question 4: Plant location by weighted factor rating
  5. Question 5: CAD, process planning, CAPP, routing sheets and group technology
  6. Question 6: Process capability against specification
  7. Question 7: Optimum ratio of men to semiautomatic machines

May 2017

  1. Question 1: The Semi-Generative Approach to Process Planning
  2. Question 2: PLC Design for a Four-Test Inspection Cell
  3. Question 3: Choosing an EOQ Approach in Three Awkward Cases
  4. Question 4: Redundancy and Component Reduction in Assembly Reliability
  5. Question 5: Generative Planning, Machinability Data and the Benefits of CAPP
  6. Question 6: Four Forecasts from One Five-Month Demand Series

December 2016

  1. Question 1: Operation Sequence Analysis and Block Layout
  2. Question 2: Materials Handling, Inventory Control and Forecasting
  3. Question 3: Inspection Organisation and the Role of Statistical Quality Control
  4. Question 4: Economic Order Interval and Total Annual Inventory Cost
  5. Question 5: Group Technology Cell Formation from a Machine-Part Matrix
  6. Question 6: Production Planning and Control — Volume, Order Types and Dispatching

May 2016

  1. Question 1: Economic Order Quantity and the Design of an Inventory Control System
  2. Question 2: Combining Product, Gage and Inspector Variability
  3. Question 3: Reliability and Maintainability of an Assembly
  4. Question 4: Demand Components, Adaptive Forecasting and Economic Forecasting
  5. Question 5: Accuracy, Precision and the Effect of Repeat Measurements
  6. Question 6: Break-Even Analysis and the Present Value of an Equipment Investment

May 2015

  1. Question 1: Lot Sizing Against a Requirements Schedule
  2. Question 2: Time Study, Standard Time and Incentive Earnings
  3. Question 3: A Control Criterion for a Purchased Watch Gear
  4. Question 4: Process Aim and Capability for Dustless Chalk
  5. Question 5: Demand Components, Adaptive Forecasting and Econometrics
  6. Question 6: Generative Process Planning, Machinability Data and CAPP
  7. Question 7: Production Planning Variables, Strategies, Search Decision Rule and Preventive Maintenance

December 2014

  1. Question 1: Process Capability and Average-and-Range Control Limits
  2. Question 2: Computer-Aided Process Planning — Justification, Types and Selection
  3. Question 3: Break-Even Justification of Numerically Controlled and Transfer Machines
  4. Question 4: CAD, Process Planning, CAPP, Routing Sheets and Group Technology
  5. Question 5: Design of an Inventory Control System for a New Product
  6. Question 6: Choosing an Economic Order Quantity Approach in Three Awkward Cases
  7. Question 7: Materials Handling, Inventory Control and Forecasting Model Selection

May 2014

  1. Question 1: Continuous Time Study — Average, Normal and Standard Time
  2. Question 2: Materials Handling, Inventory Control and Forecast-Model Selection
  3. Question 3: Break-even Analysis and Present Value of an Equipment Decision
  4. Question 4: Lot-Sizing a Requirements Schedule — EOQ, Periodic Reorder and Part-Period Balancing
  5. Question 5: Time Standards and Incentive Pay from a Short Study
  6. Question 6: Control Criterion for a Purchased Watch Gear, and its Relation to the Specification
  7. Question 7: Centralized Inspection, Computers in Quality Control, and the Educational Value of SQC
  8. Question 8: Computer Aided Process Planning, Part Coding and the Stages of a CAD System

December 2013

  1. Question 1: Process Planning in Discrete Parts Manufacturing
  2. Question 2: Control Limits for the Tabulated Data
  3. Question 3: Cells, Flexible Manufacturing Systems, Just-in-Time and Plant Networks
  4. Question 4: Justifiable Lubricant Cost for a Ring-Rolling Operation
  5. Question 5: Assembly-Line Balancing
  6. Question 6: Selling Price and Breakeven for the Green Manufacturing Company
  7. Question 7: Forecasting the Demand for a Product

May 2013

  1. Question 1: Components of Demand, Adaptive Forecasting and Econometric Forecasting
  2. Question 2: Priority Dispatching at a Work Centre
  3. Question 3: Categories of Forecasting Technique, and Method Selection from Data
  4. Question 4: Facility Location by Weighted Factor Rating
  5. Question 5: Workforce Sizing for a Fixed-Deadline Contract
  6. Question 6: Shewhart Control Charts and Their Power to Detect a Shift

Undated paper

  1. Question 1: Order Interval and Total Inventory Cost
  2. Question 2: Control Limits, Detection Time and Detection Probability
  3. Question 3: Planning a Materials Handling System
  4. Question 4: Redundancy and Simplification in Assembly Reliability
  5. Question 5: Economic Order Quantity for Cemented-Carbide Inserts
  6. Question 6: Digital-to-Analog Conversion with a Zero-Order Hold
  7. Question 7: Break-even Analysis and Present Value of a New Machine