NivaarExam Prep

18-Env-B4 Site Assessment and Remediation

Worked solutions to 6 past sittings (2013–2019), 46 questions. Pick a sitting, or start from a topic below.

Topics across the sittings

Topics that come up in more than one sitting, taken from the headings of our worked solutions. A topic counts once per sitting.

Questions by sitting

December 2019

  1. Question 1: PCE Spill – Migration Pathways and Site Assessment
  2. Question 2: Preliminary Site Assessment – Former GM Assembly Plant, Oshawa
  3. Question 3: Brownfield Redevelopment – Toronto Housing Shortage
  4. Question 4: Bioventing for Petroleum Hydrocarbon Remediation
  5. Question 5: "Dig and Dump" – Merits, Challenges, and RSC Requirement
  6. Question 6: Section B — answer ONE of TWO (both answered)
  7. Question 7: Gasoline Tank Leak – Release Mass and Bioventing Air Exchanges

December 2017

  1. Question 1: Migration Pathways and Sampling for an Airport Kerosene Spill
  2. Question 2: Phase II Investigation and Remediation of a Closed Chromium Plating Facility
  3. Question 3: Record of Site Condition — Purpose, Content and Responsibility
  4. Question 4: On-Site vs. Off-Site Treatment of Contaminated Brownfield Soil in Southern Ontario
  5. Question 5: Parameters and Modelling Relationships for DNAPL Infiltration After a Tanker-Car Derailment
  6. Question 6: Section B — One of Two Questions
  7. Question 7: Evaporative Loss Time for a Gasoline Spill in Sandy Loam Soil

December 2015

  1. Question 1: Sampling Plan for a Rail-Yard Crude Oil Spill
  2. Question 2: In-Situ vs. Ex-Situ Remediation of a Former Munitions Factory
  3. Question 3: Phase I vs. Phase II Environmental Site Assessments
  4. Question 4: Brownfield Redevelopment in Central Southern Ontario
  5. Question 5: Modelling a Gasoline Release from an Underground Storage Tank
  6. Question 6: Section B — Two of Three Questions
  7. Question 7: TCE Migration and Pump-and-Treat Remediation
  8. Question 8: Bioventing a Gasoline-Contaminated Soil Pile

December 2014

  1. Question 1: Site Assessment for a Former Plating Facility
  2. Question 2: Leachate Sampling Program for a Closed Hazardous Waste Landfill
  3. Question 3: Rail Tanker Derailment — PCE Release
  4. Question 4: First Response to a Mercury Spill at a Landfill
  5. Question 5: Environmental Impact of Hydraulic Fracturing near Chatham, Ontario
  6. Question 6: Section B — Two of Three Questions
  7. Question 7: Three-Phase Equilibrium Partitioning of Toluene
  8. Question 8: Retarded Contaminant Travel Time, Pond 1 to Pond 2

May 2014

  1. Question 1: Site Assessment for a Dry-Cleaning Unit (PCE)
  2. Question 2: Phase II Sampling at a Closing Fastener Plant
  3. Question 3: Rail-Tanker Crude Oil Derailment — Fate in the Vadose Zone
  4. Question 4: First-Responder Decisions Protecting a Downgradient Wetland
  5. Question 5: Record of Site Condition for a Brownfield Redevelopment
  6. Question 6: Section B — Two of Three Questions
  7. Question 7: Benzene Sorption and Retarded Plume Travel Time
  8. Question 8: m-Xylene Pool Volatilization Time

May 2013

  1. Question 1: Site Assessment for a Former Car-Rim Stamping Facility
  2. Question 2: Sampling Program for a Closed Heavy-Metal Plating Facility
  3. Question 3: Fate and Transport of a Leaking Gasoline UST
  4. Question 4: Ideal Remediation Solution for the Combined Soil/Groundwater Impact
  5. Question 5: Barriers to Brownfield Redevelopment
  6. Question 6: Pump-and-Treat Clean-Up Time for a TCE Spill
  7. Question 7: Bioventing Air Flow and First-Order Remediation Time
  8. Question 8: Sorption-Controlled Extent of a BTEX Wastewater Spill