24-Bld-A7 Building Envelope Design
Worked solutions to 4 past sittings (2016–2017), 25 questions. Pick a sitting, or start from a topic below.
Questions by sitting
December 2017
May 2017
May 2016
Undated paper
- Question 1: Building Envelope True/False
- Question 2: Building Envelope Short-Answer
- Question 3: Brick Veneer Wall – Effective RSI, Condensation Check, Vapour Retarder
- Question 4: Precast Concrete Spandrel Panel – Thermal Movement and Sealant Joint Design
- Question 5: Precast Panel Support – Spalling Concrete Diagnosis
- Question 6: Ice Damming and Brick-Under-Coping Deterioration
- Question 7: Window/Wall Air Barrier Continuity and Flashing Failure Case Study